According to Vans, with a 600 to 900 hour assembly time, I am now either 1/6th or 1/9th of my way to completion.
A few mistakes have been made and three rivets will have to be drilled out and replaced but removal of the pulled rivets is very easy.
I have a recurrence of carpel tunnel irritation so I purchased a pneumatic cleco gun. I would recommend it to anyone simply because it is so much faster to install and remove clecos. I also purchased a Ryobi 4 Volt nut driver and turned an adaptor for the deburring of holes. That also relieves excessive wrist motion. The nut driver turns at 150 rpm and has Li-ion batteries and holds a charge for a long time.
After installing the hinge brackets for the flaperons, one of my fellow EAA members asked how would I know if they are aligned properly. I came up with a laser mounted on a camera tripod and focused the laser beam through the holes in the hinge brackets. I figured that if the laser beam goes through all of the brackets and shows up on the far garage door, then the bracket holes are in line. I gauged both wings and they seemed to be aligned properly.
Currently I am at a build time of 113 hours. It just took me this long to update the blog.
No comments:
Post a Comment